Objective:
Warm-up:
1. Scantron (on top, covering the test correction directions)
2. Test corrections (directions face up, covered by the Scantron)
3. Test
All directions my be followed in order to earn credit. That includes making sure to arrange your corrections sheet and test in the correct order.